40 C.F.R. § 60.5780b

What compliance dates and compliance periods must I include in my State plan?

Last amended: 2024Year: 2026Length: 157 wordsSubsections: 1Official source

Cite as 40 C.F.R. § 60.5780b (2026)

(a) The State plan must include the following compliance dates: (1) For affected EGUs in the long-term coal-fired subcategory, the State plan must require compliance with the applicable standards of performance starting no later than January 1, 2032, unless the State has applied a later compliance date pursuant to § 60.24a(e) through (h). (2) For affected EGUs in the medium-term coal-fired subcategory, the base load oil-fired subcategory, the intermediate load oil-fired steam generating subcategory, the low load oil-fired subcategory, the base load natural gas-fired subcategory, the intermediate load natural gas-fired subcategory, and the low load natural gas-fired subcategory, the State plan must require compliance with the applicable standards of performance starting no later than January 1, 2030, unless State has applied a later compliance date pursuant to § 60.24a(e) through (h). (b) The State plan must require affected EGUs to achieve compliance with their applicable standards of performance for each compliance period as defined in § 60.5880b.
Cross-references to the CFR
60.24a60.5880b.
40 C.F.R. § 60.5780b: What compliance dates and compliance periods must I include in my State plan? | Justis AI