40 C.F.R. § 60.5845b

What affected EGUs must I address in my State plan?

Last amended: 2024Year: 2026Length: 127 wordsSubsections: 1Official source

Cite as 40 C.F.R. § 60.5845b (2026)

(a) The EGUs that must be addressed by your State plan are: (1) Any affected EGUs that were in operation or had commenced construction on or before January 8, 2014; (2) Coal-fired steam generating units that commenced a modification on or before May 23, 2023. (b) An affected EGU is a steam generating unit that meets the relevant applicability conditions specified in paragraphs (b)(1) through (2) of this section, as applicable, except as provided in § 60.5850b. (1) Serves a generator capable of selling greater than 25 MW to a utility power distribution system; and (2) Has a base load rating ( i.e., design heat input capacity) greater than 260 GJ/hr (250 MMBtu/hr) heat input of fossil fuel (either alone or in combination with any other fuel).