40 C.F.R. § 62.14650a
By what date must I conduct the annual air pollution control device inspection?
Cite as 40 C.F.R. § 62.14650a (2026)
On an annual basis (no more than 12 months following the previous annual air pollution control device inspection), you must complete the air pollution control device inspection as described in § 62.14635a.
- Cross-references to the CFR
- 62.14635a.