40 C.F.R. Table 1 to Subpart HHHHHH of Part 63

Applicability of General Provisions to Subpart HHHHHH of Part 63

Last amended: 2022Year: 2026Length: 727 wordsOfficial source

Cite as 40 C.F.R. Table 1 to Subpart HHHHHH of Part 63 (2026)

Table 1 to Subpart HHHHHH of Part 63—Applicability of General Provisions to Subpart HHHHHH of Part 63 Citation Subject Applicable to subpart HHHHHH Explanation § 63.1(a)(1)-(12) General Applicability Yes § 63.1(b)(1)-(3) Initial Applicability Determination Yes Applicability of subpart HHHHHH is also specified in § 63.11170. § 63.1(c)(1) Applicability After Standard Established Yes § 63.1(c)(2) Applicability of Permit Program for Area Sources Yes § 63.11174(b) of subpart HHHHHH exempts area sources from the obligation to obtain Title V operating permits. § 63.1(c)(5) Notifications Yes § 63.1(e) Applicability of Permit Program to Major Sources Before Relevant Standard is Set No § 63.11174(b) of subpart HHHHHH exempts area sources from the obligation to obtain Title V operating permits. § 63.2 Definitions Yes Additional definitions are specified in § 63.11180. § 63.3(a)-(c) Units and Abbreviations Yes § 63.4(a)(1)-(5) Prohibited Activities Yes § 63.4(b)-(c) Circumvention/Fragmentation Yes § 63.5 Construction/Reconstruction of major sources No Subpart HHHHHH applies only to area sources. § 63.6(a) Compliance With Standards and Maintenance Requirements—Applicability Yes § 63.6(b)(1)-(7) Compliance Dates for New and Reconstructed Sources Yes § 63.11172 specifies the compliance dates. § 63.6(c)(1)-(5) Compliance Dates for Existing Sources Yes § 63.11172 specifies the compliance dates. § 63.6(e)(1)-(2) Operation and Maintenance Requirements No See § 63.11173(h) for general duty requirement. § 63.6(e)(3) Startup, Shutdown, and Malfunction Plan No No startup, shutdown, and malfunction plan is required by subpart HHHHHH. § 63.6(f)(1) Compliance with Nonopacity Emission Standards—Applicability No. § 63.6(f)(2)-(3) Methods for Determining Compliance Yes § 63.6(g)(1)-(3) Use of an Alternative Standard Yes § 63.6(h) Compliance With Opacity/Visible Emission Standards No Subpart HHHHHH does not establish opacity or visible emission standards. § 63.6(i)(1)-(16) Extension of Compliance Yes § 63.6(j) Presidential Compliance Exemption Yes § 63.7 Performance Testing Requirements No No performance testing is required by subpart HHHHHH. § 63.8 Monitoring Requirements No Subpart HHHHHH does not require the use of continuous monitoring systems. § 63.9(a)-(d) Notification Requirements Yes § 63.11175 specifies notification requirements. § 63.9(e) Notification of Performance Test No Subpart HHHHHH does not require performance tests. § 63.9(f) Notification of Visible Emissions/Opacity Test No Subpart HHHHHH does not have opacity or visible emission standards. § 63.9(g) Additional Notifications When Using CMS No Subpart HHHHHH does not require the use of continuous monitoring systems. § 63.9(h) Notification of Compliance Status No § 63.11175 specifies the dates and required content for submitting the notification of compliance status. § 63.9(i) Adjustment of Submittal Deadlines Yes § 63.9(j) Change in Previous Information Yes § 63.11176(a) specifies the dates for submitting the notification of changes report. § 63.9(k) Electronic reporting procedures Yes Only as specified in § 63.9(j). § 63.10(a) Recordkeeping/Reporting—Applicability and General Information Yes § 63.10(b)(1) General Recordkeeping Requirements Yes Additional requirements are specified in § 63.11177. § 63.10(b)(2)(i)-(xi) Recordkeeping Relevant to Startup, Shutdown, and Malfunction Periods and CMS No Subpart HHHHHH does not require startup, shutdown, and malfunction plans, or CMS. § 63.10(b)(2)(xii) Waiver of recordkeeping requirements Yes § 63.10(b)(2)(xiii) Alternatives to the relative accuracy test No Subpart HHHHHH does not require the use of CEMS. § 63.10(b)(2)(xiv) Records supporting notifications Yes § 63.10(b)(3) Recordkeeping Requirements for Applicability Determinations Yes § 63.10(c) Additional Recordkeeping Requirements for Sources with CMS No Subpart HHHHHH does not require the use of CMS. § 63.10(d)(1) General Reporting Requirements Yes Additional requirements are specified in § 63.11176. § 63.10(d)(2)-(3) Report of Performance Test Results, and Opacity or Visible Emissions Observations No Subpart HHHHHH does not require performance tests, or opacity or visible emissions observations. § 63.10(d)(4) Progress Reports for Sources With Compliance Extensions Yes § 63.10(d)(5) Startup, Shutdown, and Malfunction Reports No Subpart HHHHHH does not require startup, shutdown, and malfunction reports. § 63.10(e) Additional Reporting requirements for Sources with CMS No Subpart HHHHHH does not require the use of CMS. § 63.10(f) Recordkeeping/Reporting Waiver Yes § 63.11 Control Device Requirements/Flares No Subpart HHHHHH does not require the use of flares. § 63.12 State Authority and Delegations Yes § 63.13 Addresses of State Air Pollution Control Agencies and EPA Regional Offices Yes § 63.14 Incorporation by Reference Yes Test methods for measuring paint booth filter efficiency and spray gun transfer efficiency in § 63.11173(e)(2) and (3) are incorporated and included in § 63.14. § 63.15 Availability of Information/Confidentiality Yes § 63.16(a) Performance Track Provisions—reduced reporting Yes § 63.16(b)-(c) Performance Track Provisions—reduced reporting No Subpart HHHHHH does not establish numerical emission limits. [87 CFR 67806, Nov. 10, 2022]
Cross-references to the CFR
63.163.1063.1163.11170.63.1117263.1117363.1117463.1117563.1117663.11176.63.11177.63.11180.63.1263.1363.1463.14.63.1563.1663.263.363.463.563.663.763.863.9
40 C.F.R. Table 1 to Subpart HHHHHH of Part 63: Applicability of General Provisions to Subpart HHHHHH of Part 63 | Justis AI