40 C.F.R. Table 1 to Subpart QQQQQQ of Part 63

Applicability of General Provisions to Subpart QQQQQQ

Last amended: 2023Year: 2026Length: 950 wordsOfficial source

Cite as 40 C.F.R. Table 1 to Subpart QQQQQQ of Part 63 (2026)

As required in § 63.11432, you must comply with the requirements of the NESHAP General Provisions (40 CFR part 63, subpart A) as shown in the following table. Citation Subject Applies to subpart QQQQQQ? Explanation 63.1(a)(1)-(4) General applicability of the General Provisions Yes 63.1(a)(5) Reserved No 63.1(a)(6) General applicability of the General Provisions Yes 63.1(a)(7)-(9) Reserved No 63.1(a)(10)-(12) General applicability of the General Provisions Yes 63.1(b)(1) Initial applicability determination Yes 63.1(b)(2) Reserved No 63.1(b)(3) Record of applicability determination Yes 63.1(c)(1)-(2) Applicability of subpart A of this part after a relevant standard has been set Yes 63.1(c)(3)-(4) Reserved No 63.1(c)(5) Notification requirements for an area source that increases HAP emissions to major source levels Yes 63.1(c)(6) Reclassification Yes 63.1(d) Reserved No 63.1(e) Applicability of permit program before a relevant standard has been set Yes 63.2 Definitions Yes 63.3 Units and abbreviations Yes 63.4 Prohibited activities and circumvention Yes 63.5(a)(1) Applicability of preconstruction review requirements No 63.5(a)(2) Applicability of notification requirements Yes 63.5(b)(1) Requirements for newly constructed and reconstructed sources Yes 63.5(b)(2) Reserved No 63.5(b)(3) Required preconstruction approval required for major source construction and reconstruction No Subpart QQQQQQ does not regulate major sources. 63.5(b)(4) Notification requirements for construction or reconstruction of area sources Yes 63.5(b)(5) Reserved No 63.5(b)(6) Added equipment (or a process change) must be considered part of the affected source and subject to all provisions in the relevant standards Yes 63.5(c) Reserved No 63.5(d) Application for approval of construction or reconstruction No Subpart QQQQQQ does not require an application for construction or reconstruction. 63.5(e) Approval of construction or reconstruction No Subpart QQQQQQ does not require application approval before construction or reconstruction. 63.5(f) Approval of construction or reconstruction based on prior State preconstruction review No Subpart QQQQQQ does not require approval of construction or reconstruction based on prior State preconstruction review. 63.6(a) Compliance with standards and maintenance requirements Yes 63.6(b)(1)-(5) Compliance dates for new and reconstructed sources Yes 63(b)(6) Reserved No 63(b)(7) Compliance dates for new and reconstructed sources Yes 63.6(c)(1)-(2) Compliance dates for existing sources Yes 63.6(c)(3)-(4) Reserved No 63.6(c)(5) Compliance dates for existing sources Yes 63.6(d) Reserved No 63.6(e)(1) Operation and maintenance requirements Yes 63.6(e)(2) Reserved No 63.6(e)(3)(i) Startup, shutdown, and malfunction plan No Subpart QQQQQQ does not require a startup, shutdown, and malfunction plan. 63.6(e)(3)(ii) Reserved No 63.6(e)(3)(iii)-(ix) Startup, shutdown, and malfunction plan No Subpart QQQQQQ does not require a startup, shutdown, and malfunction plan. 63.6(f) Compliance with nonopacity emission standards No Subpart QQQQQQ does not contain emission or opacity limits. 63.6(g) Use of an alternative nonopacity emission standard No Subpart QQQQQQ does not contain emission or opacity limits. 63.6(h)(1) Compliance with opacity and visible emissions standards No Subpart QQQQQQ does not contain emission or opacity limits. 63.6(h)(2)(i) Compliance with opacity and visible emissions standards No Subpart QQQQQQ does not contain emission or opacity limits. 63.6(h)(2)(ii) Reserved No 63.6(h)(2)(iii) Compliance with opacity and visible emissions standards No Subpart QQQQQQ does not contain emission or opacity limits. 63.6(h)(3) Reserved No 63.6(h)(4) Notification of opacity or visible emission observations No Subpart QQQQQQ does not contain emission or opacity limits. 63.6 (h)(5)(i)-(iii) Conduct of opacity or visible emission observations No Subpart QQQQQQ does not contain emission or opacity limits. 63.6(h)(5)(iv) Reserved No 63.6(h)(5)(v) Conduct of opacity or visible emission observations No Subpart QQQQQQ does not contain emission or opacity limits. 63.6(h)(6)-(9) Availability of records and use of continuous opacity monitoring system No Subpart QQQQQQ does not contain emission or opacity limits. 63.6(i) Extension of compliance with emissions standards Yes 63.6(j) Exemption from compliance with emissions standards Yes 63.7 Performance Testing Requirements No Subpart QQQQQQ does not require performance tests. 63.8(a)(1)-(2) Applicability of monitoring requirements No Subpart QQQQQQ does not require monitoring of emissions. 63.8(a)(3) Reserved No 63.8(a)(4) Applicability of monitoring requirements No Subpart QQQQQQ does not require monitoring of emissions. 63.8(b)-(g) Conduct of monitoring No Subpart QQQQQQ does not require monitoring of emissions. 63.9(a) Applicability and general information for notification requirements Yes 63.9(b)(1)-(2) Initial notifications Yes 63.9(b)(3) Reserved No 63.9(b)(4)-(5) Initial notifications Yes 63.9(c)-(d) Extension of compliance and special compliance requirements Yes 63.9(e), (f), (g) Notification of performance test, opacity and visible emission observation, and requirements for sources with continuous monitoring systems No Subpart QQQQQQ does not require monitoring of emissions. 63.9(h)(1)-(3) Notification of compliance status Yes 63.9(h)(4) Reserved No 63.9(h)(5)-(6) Notification of compliance status Yes 63.9(i)-(j) Adjustment to time periods or postmark deadlines for submittal and review of required communications, and change in information already provided Yes 63.9(k) Electronic submission of notifications and reports No Subpart QQQQQQ does not require electronic reporting. 63.10(a)-(b) Recordkeeping and reporting requirement applicability and general information No Subpart QQQQQQ establishes requirements for a report of deviations within 30 days. 63.10(c)(1) Additional recordkeeping requirements for sources with continuous monitoring systems No Subpart QQQQQQ does not require the use of continuous monitoring systems. 63.10(c)(2)-(4) Reserved No 63.10(c)(5)-(8) Additional recordkeeping requirements for sources with continuous monitoring systems No Subpart QQQQQQ does not require the use of continuous monitoring systems. 63.10(c)(9) Reserved No 63.10(c)(10)-(15) Additional recordkeeping requirements for sources with continuous monitoring systems No Subpart QQQQQQ does not require the use of continuous monitoring systems. 63.10(d)-(f) General reporting requirements, additional requirements for sources with continuous monitoring systems, and waiver of recordkeeping or reporting requirements No Subpart QQQQQQ establishes requirements for a report of deviations within 30 days. 63.11 Control device requirements for flares and work practice requirements for monitoring leaks No Subpart QQQQQQ does not require flares and does not require monitoring for leaks. 63.12 State authorities and delegations Yes 63.13 Addresses of state air pollution control agencies and EPA Regional Offices Yes 63.14 Incorporations by Reference Yes 63.15 Availability of information and confidentiality Yes 63.16 Requirements for Performance Track member facilities Yes [88 FR 14288, Mar. 8, 2023]
Cross-references to the CFR
63.11432
40 C.F.R. Table 1 to Subpart QQQQQQ of Part 63: Applicability of General Provisions to Subpart QQQQQQ | Justis AI