40 C.F.R. Table 3 to Subpart PPPPPP of Part 63

Applicability of General Provisions to This Subpart

Last amended: 2023Year: 2026Length: 385 wordsOfficial source

Cite as 40 C.F.R. Table 3 to Subpart PPPPPP of Part 63 (2026)

As required in § 63.11425, you must comply with the requirements of the NESHAP General Provisions (subpart A of this part) as shown in the following table. Citation Subject Applies to this subpart? Explanation 63.1 Applicability Yes 63.2 Definitions Yes 63.3 Units and Abbreviations 63.4 Prohibited Activities and Circumvention Yes 63.5 Preconstruction Review and Notification Requirements No 63.6(a) through (d) Compliance with Standards and Maintenance Requirements Yes 63.6(e)(1)(i) General Duty to Minimize Emissions No Section 63.11423(a)(3) specifies general duty requirements. 63.6(e)(1)(ii) Requirement to correct malfunctions as soon as possible No 63.6(e)(1)(iii) Enforceability of requirements independent of other regulations Yes 63.6(e)(3) SSM Plans No This subpart does not require a startup, shutdown, and malfunction plan. 63.6(f)(1) Compliance Except During SSM No 63.6(f)(2) and (3) Methods for determining compliance Yes 63.6(g) Use of an alternative nonopacity emission standard Yes 63.6(h)(1) SSM Exemption No 63.6(h)(2) through (9), (i) through (j) Compliance with opacity/visible emission standards, compliance extensions and exemptions Yes 63.7(a) through (d), (e)(2) and (3), (f) through (h) Performance Testing Requirements Yes 63.7(e)(1) Conditions for conducting performance tests No Requirements for performance test conditions are found in § 63.11423(c)(7). 63.8(a), (b), (c)(1)(ii), (d)(1) and (2), (e) through (g) Monitoring Requirements Yes 63.8(c)(1)(i) General duty to minimize emissions and CMS operation No Section 63.11423(a)(3) specifies general duty requirements. 63.8(c)(1)(iii) Requirement to develop SSM Plan for CMS No 63.8(d)(3) Written procedures for CMS No 63.9 Notification Requirements Yes 63.10(a), (b)(1), (b)(2)(iii), (b)(2)(vi) through (ix), (b)(3), (c)(1) through (14), (d)(1) through (4), (e), (f) Recordkeeping and Reporting Requirements Yes 63.10(b)(2)(i) Recordkeeping of occurrence and duration of startups and shutdowns No 63.10(b)(2)(ii) Recordkeeping of failures to meet a standard No Section 63.11424(a)(5) specifies these requirements. 63.10(b)(2)(iv) and (v) Actions taken to minimize emissions during SSM No 63.10(c)(15) Use of SSM Plan No 63.10(d)(5) No This subpart does not require a startup, shutdown, and malfunction plan. See § 63.11424(c) for excess emissions reporting requirements. 63.11 Control Device Requirements No This subpart does not require flares. 63.12 State Authorities and Delegations Yes 63.13 Addresses Yes 63.14 Incorporations by Reference Yes 63.15 Availability of Information and Confidentiality Yes 63.16 Performance Track Provisions Yes 63.1(a)(5), (a)(7) through (9), (b)(2), (c)(3), (d), 63.6(b)(6), (c)(3) and (4), (d), (e)(2), (e)(3)(ii), (h)(3), (h)(5)(iv), 63.8(a)(3), 63.9(b)(3), (h)(4), 63.10(c)(2) through (4), (c)(9) Reserved No [88 FR 11596, Feb. 23, 2023]
Cross-references to the CFR
63.1142363.1142463.11425
40 C.F.R. Table 3 to Subpart PPPPPP of Part 63: Applicability of General Provisions to This Subpart | Justis AI