40 C.F.R. Table 4 to Subpart NNNNN of Part 63

Initial Compliance With Emission Limitations and Work Practice Standards

Last amended: 2016Year: 2026Length: 325 wordsOfficial source

Cite as 40 C.F.R. Table 4 to Subpart NNNNN of Part 63 (2026)

As stated in § 63.9030, you must comply with the following requirements to demonstrate initial compliance with the applicable emission limits for each affected source vented to a control device and each work practice standard. For each . . . For the following emission limit or work practice standard . . . You have demonstrated initial compliance if . . . 1. HCl process vent and each HCl storage tank and HCl transfer operation for which you are conducting a performance test a. In Table 1 to this subpart i. The average percent reduction of HCl and Cl 2 (if applicable), measured over the period of the performance test conducted according to Table 3 of this subpart and determined in accordance with § 63.9020(b), is greater than or equal to the applicable percent reduction emission limitation specified in Table 1 of this subpart; or ii. The average HCl and Cl 2 (if applicable) concentration, measured over the period of the performance test conducted according to Table 3 of this subpart, is less than or equal to the applicable concentration emission limitation specified in Table 1 of this subpart. 2. HCl storage tank and HCl transfer operation for which you are preparing a design evaluation in lieu of conducting a performance test a. In Table 1 to this subpart i. The percent reduction of HCl, demonstrated by a design evaluation prepared in accordance with § 63.9020(c), is greater than or equal to the applicable percent reduction emission limitation specified in Table 1 of this subpart; or ii. The HCl concentration, demonstrated by a design evaluation prepared in accordance with § 63.9020(c), is less than or equal to the applicable concentration emission limitation specified in Table 1 of this subpart. 3. Leaking equipment a. In Table 1 to this subpart i. You certify in your Notification of Compliance Status that you have developed and implemented your LDAR plan and submitted it to the Administrator for comment only.
Cross-references to the CFR
63.902063.9030
40 C.F.R. Table 4 to Subpart NNNNN of Part 63: Initial Compliance With Emission Limitations and Work Practice Standards | Justis AI