40 C.F.R. Table 6 to Subpart GGG of Part 63
Wastewater—Compliance Options for Wastewater Tanks
Cite as 40 C.F.R. Table 6 to Subpart GGG of Part 63 (2026)
Capacity, m 3 Maximum true vapor pressure, kPa Control requirements <75 § 63.1256(b)(1). >75 and <151 <13.1 § 63.1256(b)(1). >13.1 § 63.1256(b)(2). >151 <5.2 § 63.1256(b)(1). >5.2 § 63.1256(b)(2).
- Cross-references to the CFR
- 63.1256