40 C.F.R. Table 7 to Subpart VVVV of Part 63

Applicability and Timing of Notifications

Last amended: 2016Year: 2026Length: 251 wordsOfficial source

Cite as 40 C.F.R. Table 7 to Subpart VVVV of Part 63 (2026)

As specified in § 63.5761(a), you must submit notifications according to the following table: If your facility— You must submit— By this date— 1. Is an existing source subject to this subpart An initial notification containing the information specified in § 63.9(b)(2) No later than the dates specified in § 63.9(b)(2). 2. Is a new source subject to this subpart The notifications specified in § 63.9(b) (3) to (5) No later than the dates specified § 63.9(b)(4) and (5). 3. Qualifies for a compliance extension as specified in § 63.9(c) A request for a compliance extension as specified in § 63.9(c) No later than the dates specified in § 63.6(i). 4. Is complying with organic HAP content limits, application equipment requirements; or MACT model point value averaging provisions A notification of compliance status as specified in § 63.9(h) No later than 30 calendar days after the end of the first 12-month averaging period after your facility's compliance date. 5. Is complying by using an add-on control device a. notification of intent to conduct a performance test as specified in § 63.9(e) No later than the date specified in § 63.9(e). b. A notification of the date for the continuous monitoring system performance evaluation as specified in § 63.9(g) With the notification of intent to conduct a performance test. c. A notification of compliance status as specified in § 63.9(h) No later than 60 calendar days after the completion of the add-on control device performance test and continuous monitoring system performance evaluation.
Cross-references to the CFR
63.576163.663.9