40 C.F.R. Table 7 to Subpart YYYY of Part 63

Applicability of General Provisions to Subpart YYYY

Last amended: 2021Year: 2026Length: 1,128 wordsOfficial source

Cite as 40 C.F.R. Table 7 to Subpart YYYY of Part 63 (2026)

You must comply with the applicable General Provisions requirements: Citation Subject Applies to subpart YYYY Explanation § 63.1 General applicability of the General Provisions Yes Additional terms defined in § 63.6175. § 63.2 Definitions Yes Additional terms defined in § 63.6175. § 63.3 Units and abbreviations Yes § 63.4 Prohibited activities Yes § 63.5 Construction and reconstruction Yes § 63.6(a) Applicability Yes § 63.6(b)(1)-(4) Compliance dates for new and reconstructed sources Yes § 63.6(b)(5) Notification Yes § 63.6(b)(6) [Reserved] § 63.6(b)(7) Compliance dates for new and reconstructed area sources that become major Yes § 63.6(c)(1)-(2) Compliance dates for existing sources Yes § 63.6(c)(3)-(4) [Reserved] § 63.6(c)(5) Compliance dates for existing area sources that become major Yes § 63.6(d) [Reserved] § 63.6(e)(1)(i) General duty to minimize emissions Yes before September 8, 2020. No after September 8, 2020. See § 63.6105 for general duty requirement. § 63.6(e)(1)(ii) Requirement to correct malfunctions ASAP Yes before September 8, 2020. No after September 8, 2020. § 63.6(e)(1)(iii) Operation and Maintenance Requirements Yes § 63.6(e)(2) [Reserved] § 63.6(e)(3) SSMP Yes before September 8, 2020. No after September 8, 2020. § 63.6(f)(1) Applicability of standards except during startup, shutdown, or malfunction (SSM) Yes before September 8, 2020. No after September 8, 2020. § 63.6(f)(2) Methods for determining compliance Yes § 63.6(f)(3) Finding of compliance Yes § 63.6(g)(1)-(3) Use of alternative standard Yes § 63.6(h) Opacity and visible emission standards No Subpart YYYY does not contain opacity or visible emission standards. § 63.6(i) Compliance extension procedures and criteria Yes § 63.6(j) Presidential compliance exemption Yes § 63.7(a)(1)-(2) Performance test dates Yes Subpart YYYY contains performance test dates at § 63.6110. § 63.7(a)(3) Section 114 authority Yes § 63.7(b)(1) Notification of performance test Yes § 63.7(b)(2) Notification of rescheduling Yes § 63.7(c) Quality assurance/test plan Yes § 63.7(d) Testing facilities Yes § 63.7(e)(1) Conditions for conducting performance tests Yes before September 8, 2020. No after September 8, 2020. § 63.7(e)(2) Conduct of performance tests and reduction of data Yes Subpart YYYY specifies test methods at § 63.6120. § 63.7(e)(3) Test run duration Yes § 63.7(e)(4) Administrator may require other testing under section 114 of the CAA Yes § 63.7(f) Alternative test method provisions Yes § 63.7(g) Performance test data analysis, recordkeeping, and reporting Yes § 63.7(h) Waiver of tests Yes § 63.8(a)(1) Applicability of monitoring requirements Yes Subpart YYYY contains specific requirements for monitoring at § 63.6125. § 63.8(a)(2) Performance specifications Yes § 63.8(a)(3) [Reserved] § 63.8(a)(4) Monitoring for control devices No § 63.8(b)(1) Monitoring Yes § 63.8(b)(2)-(3) Multiple effluents and multiple monitoring systems Yes § 63.8(c)(1) Monitoring system operation and maintenance Yes § 63.8(c)(1)(i) General duty to minimize emissions and CMS operation Yes before September 8, 2020. No after September 8, 2020. § 63.8(c)(1)(ii) Parts for repair of CMS readily available Yes § 63.8(c)(1)(iii) Requirement to develop SSM Plan for CMS Yes before September 8, 2020. No after September 8, 2020. § 63.8(c)(2)-(3) Monitoring system installation Yes § 63.8(c)(4) Continuous monitoring system (CMS) requirements Yes Except that subpart YYYY does not require continuous opacity monitoring systems (COMS). § 63.8(c)(5) COMS minimum procedures No § 63.8(c)(6)-(8) CMS requirements Yes Except that subpart YYYY does not require COMS. § 63.8(d)(1)-(2) CMS quality control Yes § 63.8(d)(3) Written procedures for CMS Yes before September 8, 2020. No after September 8, 2020. § 63.8(e) CMS performance evaluation Yes Except for § 63.8(e)(5)(ii), which applies to COMS. § 63.8(f)(1)-(5) Alternative monitoring method Yes § 63.8(f)(6) Alternative to relative accuracy test Yes § 63.8(g) Data reduction Yes Except that provisions for COMS are not applicable. Averaging periods for demonstrating compliance are specified at §§ 63.6135 and 63.6140. § 63.9(a) Applicability and State delegation of notification requirements Yes § 63.9(b)(1)-(5) Initial notifications Yes Except that § 63.9(b)(3) is reserved. § 63.9(c) Request for compliance extension Yes § 63.9(d) Notification of special compliance requirements for new sources Yes § 63.9(e) Notification of performance test Yes § 63.9(f) Notification of visible emissions/opacity test No Subpart YYYY does not contain opacity or VE standards. § 63.9(g)(1) Notification of performance evaluation Yes § 63.9(g)(2) Notification of use of COMS data No Subpart YYYY does not contain opacity or VE standards. § 63.9(g)(3) Notification that criterion for alternative to relative accuracy test audit (RATA) is exceeded Yes § 63.9(h) Notification of compliance status Yes Except that notifications for sources not conducting performance tests are due 30 days after completion of performance evaluations. § 63.9(h)(4) is reserved. § 63.9(i) Adjustment of submittal deadlines Yes § 63.9(j) Change in previous information Yes § 63.9(k) Electronic reporting procedures Yes Only as specified in § 63.9(j). § 63.10(a) Administrative provisions for recordkeeping and reporting Yes § 63.10(b)(1) Record retention Yes § 63.10(b)(2)(i) Recordkeeping of occurrence and duration of startups and shutdowns Yes before September 8, 2020. No after September 8, 2020. § 63.10(b)(2)(ii) Recordkeeping of failures to meet a standard Yes before September 8, 2020. No after September 8, 2020. See § 63.6155 for recordkeeping of (1) date, time and duration; (2) listing of affected source or equipment, and an estimate of the quantity of each regulated pollutant emitted over the standard; and (3) actions to minimize emissions and correct the failure. § 63.10(b)(2)(iii) Maintenance records Yes § 63.10(b)(2)(iv)-(v) Records related to actions during SSM Yes before September 8, 2020. No after September 8, 2020. § 63.10(b)(2)(vi)-(xi) CMS records Yes § 63.10(b)(2)(xii) Record when under waiver Yes § 63.10(b)(2)(xiii) Records when using alternative to RATA Yes § 63.10(b)(2)(xiv) Records of supporting documentation Yes § 63.10(b)(3) Records of applicability determination Yes § 63.10(c)(1)-(14) Additional records for sources using CMS Yes Except that § 63.10(c)(2)-(4) and (9) are reserved. § 63.10(c)(15) Use of SSM Plan Yes before September 8, 2020. No after September 8, 2020. § 63.10(d)(1) General reporting requirements Yes § 63.10(d)(2) Report of performance test results Yes § 63.10(d)(3) Reporting opacity or VE observations No Subpart YYYY does not contain opacity or VE standards. § 63.10(d)(4) Progress reports Yes § 63.10(d)(5) Startup, shutdown, and malfunction reports No. After September 8, 2020, see 63.6150(a) for malfunction reporting requirements. § 63.10(e)(1) and (2)(i) Additional CMS reports Yes § 63.10(e)(2)(ii) COMS-related report No Subpart YYYY does not require COMS. § 63.10(e)(3) Excess emissions and parameter exceedances reports Yes After September 8, 2020 submitted with the compliance report through CEDRI according to § 63.6150(a). § 63.10(e)(4) Reporting COMS data No Subpart YYYY does not require COMS. § 63.10(f) Waiver for recordkeeping and reporting Yes § 63.11 Flares No § 63.12 State authority and delegations Yes § 63.13 Addresses Yes After September 8, 2020 not applicable to reports required to be submitted through CEDRI by 63.6150(c), (e), (f), or (g). § 63.14 Incorporation by reference Yes § 63.15 Availability of information Yes [85 FR 13543, Mar. 9, 2020, as amended at 85 FR 73911, Nov. 19, 2020]
Cross-references to the CFR
63.163.1063.1163.1263.1363.1463.1563.263.363.463.563.663.610563.6110.63.6120.63.6125.63.613563.615063.615563.6175.63.763.863.9
40 C.F.R. Table 7 to Subpart YYYY of Part 63: Applicability of General Provisions to Subpart YYYY | Justis AI