40 C.F.R. Table 9 to Subpart JJJ of Part 63

Routine Reports Required by This Subpart

Last amended: 2016Year: 2026Length: 351 wordsOfficial source

Cite as 40 C.F.R. Table 9 to Subpart JJJ of Part 63 (2026)

Reference Description of report Due date § 63.1335(b) and subpart A Refer to Table 1 and subpart A Refer to subpart A. § 63.1335(e)(3) Precompliance Report a Existing affected sources—December 19, 2000. New affected sources—with application for approval of construction or reconstruction. § 63.1335(e)(4) Emissions Averaging Plan September 19, 2000. § 63.1335(e)(4)(iv) Updates to Emissions Averaging Plan 120 days prior to making the change necessitating the update. § 63.1335(e)(5) Notification of Compliance Status b Within 150 days after the compliance date. § 63.1335(e)(6) Periodic Reports Semiannually, no later than 60 days after the end of each 6-month period. See § 63.1335(e)(6)(i) for the due date for the first report. § 63.1335(e)(6)(xi) Quarterly reports for Emissions Averaging No later than 60 days after the end of each quarter. First report is due with the Notification of Compliance Status. § 63.1335(e)(6)(xii) Quarterly reports upon request of the Administrator No later than 60 days after the end of each quarter. § 63.1335(e)(7)(i) Storage Vessels Notification of Inspection At least 30 days prior to the refilling of each storage vessel or the inspection of each storage vessel. § 63.1335(e)(7)(ii) Requests for Approval of a Nominal Control Efficiency for Use in Emissions Averaging Initial submittal is due with the Emissions Averaging Plan specified in § 63.1335(e)(4)(ii); later submittals are made at the discretion of the owner or operator as specified in § 63.1335(e)(7)(ii) (B). § 63.1335(e)(7)(iii) Notification of Change in the Primary Product 1. For notification under § 63.1310(f)(3)(ii)—notification submittal date at the discretion of the owner or operator. c 2. For notification under § 63.1310(f)(4)(ii)—within 6 months of making the determination. a There may be two versions of this report due at different times; one for equipment subject to § 63.1331 and one for other emission points subject to this subpart. b There will be two versions of this report due at different times; one for equipment subject to § 63.1331 and one for other emission points subject to this subpart. c Note that the TPPU remains subject to this subpart until the notification under § 63.1310(f)(3)(i) is made. [66 FR 36939, July 16, 2001]
Cross-references to the CFR
63.131063.133163.1335
40 C.F.R. Table 9 to Subpart JJJ of Part 63: Routine Reports Required by This Subpart | Justis AI