40 C.F.R. § 65.65
Monitoring.
Cite as 40 C.F.R. § 65.65 (2026)
(a) An owner or operator of a Group 2A process vent maintaining a TRE index value greater than 1.0 without a recovery device shall monitor based on the approved plan as specified in § 65.63(d). (b) As required in § 65.63(a) and (c), an owner or operator of a Group 2A process vent maintaining a TRE index value greater than 1.0 with a recovery device or a Group 1 process vent shall comply with § 65.142(b).
- Cross-references to the CFR
- 65.14265.63