40 C.F.R. § 68.77

Pre-startup review.

Last amended: 2016Year: 2026Length: 124 wordsSubsections: 1Official source

Cite as 40 C.F.R. § 68.77 (2026)

(a) The owner or operator shall perform a pre-startup safety review for new stationary sources and for modified stationary sources when the modification is significant enough to require a change in the process safety information. (b) The pre-startup safety review shall confirm that prior to the introduction of regulated substances to a process: (1) Construction and equipment is in accordance with design specifications; (2) Safety, operating, maintenance, and emergency procedures are in place and are adequate; (3) For new stationary sources, a process hazard analysis has been performed and recommendations have been resolved or implemented before startup; and modified stationary sources meet the requirements contained in management of change, § 68.75. (4) Training of each employee involved in operating a process has been completed.
Cross-references to the CFR
68.75.
40 C.F.R. § 68.77: Pre-startup review. | Justis AI