40 C.F.R. § 80.130
RINs for renewable CNG/LNG from a biogas closed distribution system.
Cite as 40 C.F.R. § 80.130 (2026)
(a) General requirements. (1) Any party that generates, assigns, separates, or retires RINs for renewable CNG/LNG from a biogas closed distribution system must comply with the requirements of this section. (2) Parties must report all RIN transactions to EMTS as specified in § 80.1452. (b) RIN generation. (1) Biogas closed distribution system RIN generators must generate RINs using the applicable requirements for RIN generation in under this part. (2) RINs for renewable CNG/LNG from a biogas closed distribution system may be generated if all the following requirements are met: (i) The renewable CNG/LNG is produced from renewable biomass and qualifies to generate RINs under an approved pathway. (ii) The biogas closed distribution system RIN generator has entered into a written contract for the sale or use of a specific quantity of renewable CNG/LNG for use as transportation fuel, and has obtained affidavits from all parties selling or using the renewable CNG/LNG certifying that the renewable CNG/LNG was used as transportation fuel. (iii) The renewable CNG/LNG is used as transportation fuel and for no other purpose. (c) RIN separation. A biogas closed distribution system RIN generator must separate RINs generated for renewable CNG/LNG under § 80.1429(b)(5)(ii). (d) RIN retirement. A party must retire RINs generated for renewable CNG/LNG from a biogas closed distribution if any of the conditions specified in § 80.1434(a) apply and must comply with § 80.1434(b).
- Cross-references to the CFR
- 80.142980.143480.1452.