40 C.F.R. § 93.114
Criteria and procedures: Currently conforming transportation plan and TIP.
Cite as 40 C.F.R. § 93.114 (2026)
There must be a currently conforming transportation plan and currently conforming TIP at the time of project approval, or a project must meet the requirements in § 93.104(f) during the 12-month lapse grace period. (a) Only one conforming transportation plan or TIP may exist in an area at any time; conformity determinations of a previous transportation plan or TIP expire once the current plan or TIP is found to conform by DOT. The conformity determination on a transportation plan or TIP will also lapse if conformity is not determined according to the frequency requirements specified in § 93.104. (b) This criterion is not required to be satisfied at the time of project approval for a TCM specifically included in the applicable implementation plan, provided that all other relevant criteria of this subpart are satisfied. [62 FR 43801, Aug. 15, 1997, as amended at 73 FR 4440, Jan. 24, 2008]