43 C.F.R. § 3179.43

Data submission and notification requirements.

Last amended: 2024Year: 2026Length: 297 wordsSubsections: 3Official source

Cite as 43 C.F.R. § 3179.43 (2026)

(a) Table 1 is a summary of the Sundry Notice requirements in this subpart. Table 1 to Paragraph (a) —Notification Via Sundry Notice Requirements Sundry notice requirements Reference Flaring of gas following removal of ≥50 percent of the natural gas liquids from the gas stream on-lease § 3179.41(b)(12). Other gas sample location for flare approved by the AO § 3179.71(d)(3) and (e)(2). Unavoidable/avoidable determination of loss of oil and/or gas while drilling for loss of well control event § 3179.80. Extension of time limit or volumetric limit for well completion or recompletion flaring, or exploratory coalbed methane dewatering flaring § 3179.81(e). Extension of time limit for well testing subsequent to initial completion § 3179.82. Within 45 days of start of an emergency, estimate the volume flared or vented beyond the first 48 hours of the emergency § 3179.83(c). Delay of leak repair beyond 30 calendar days with good cause § 3179.101(b). (b) Table 2 summarizes the locations in this subpart that require an operator to provide information to the authorized officer upon request. Table 2 to Paragraph (b) —Information Required at the Request of the AO Information required at the request of the AO Reference Ultrasonic meter flare gas testing report § 3179.71(c)(2)(i). Ultrasonic meter manufacturer's specifications including installation and operation specifications § 3179.71(c)(2)(ii). Recordkeeping for vented or flared gas events § 3179.72(c). Recordkeeping for leak detection and repair § 3179.102(a). (c) Table 3 summarizes the initial LDAR program submission and subsequent annual reporting. Table 3 to Paragraph ( c )—LDAR Program Information required to be sent to the BLM State Office Reference First submission of a leak detection and repair program to the BLM for review § 3179.100(b) and (d). Annual review and update of the leak detection and repair program to the BLM § 3179.100(e).
Cross-references to the CFR
3179.1003179.1013179.1023179.413179.713179.723179.80.3179.813179.82.3179.83
43 C.F.R. § 3179.43: Data submission and notification requirements. | Justis AI