43 C.F.R. § 3262.10

What operational requirements must I meet when drilling a well?

Last amended: 2016Year: 2026Length: 118 wordsSubsections: 4Official source

Cite as 43 C.F.R. § 3262.10 (2026)

(a) When drilling a well, you must: (1) Keep the well under control at all times by: (i) Conducting training during your operation to maintain the capability of your personnel to perform emergency procedures quickly and effectively; (ii) Using properly maintained equipment; and (iii) Using operational practices that allow for quick and effective emergency response. (b) You must use sound engineering principles and take into account all pertinent data when: (1) Selecting and using drilling fluid types and weights; (2) Designing and implementing a system to control fluid temperatures; (3) Designing and using blowout prevention equipment; and (4) Designing and implementing a casing and cementing program. (c) Your operation must always comply with the requirements of § 3200.4.
Cross-references to the CFR
3200.4.
43 C.F.R. § 3262.10: What operational requirements must I meet when drilling a well? | Justis AI