43 C.F.R. § 3276.13

What additional information must I give BLM in the monthly report for flash and dry steam facilities?

Last amended: 2016Year: 2026Length: 88 wordsSubsections: 6Official source

Cite as 43 C.F.R. § 3276.13 (2026)

In addition to the regular monthly report information required by § 3276.12, send to BLM: (a) Steam flow into the turbine in klbs; for dual flash facilities, you must separate the steam flow into high pressure steam and low pressure steam; (b) Condenser pressure in psia; (c) Condenser temperature in deg. F; (d) Auxiliary steam flow used for gas ejectors, steam seals, pumps, etc., in klbs; (e) Flow of condensate out of the plant (after the cooling towers) in klbs; and (f) Any other information we may require.