43 C.F.R. § 3715.2-3

Under what circumstances will BLM allow me to temporarily occupy a site for more than 14 days?

Last amended: 2016Year: 2026Length: 64 wordsOfficial source

Cite as 43 C.F.R. § 3715.2-3 (2026)

BLM may allow temporary occupancy at a single site to extend beyond the 14-day period described in § 3715.1 if you need to secure the site beyond 14 days through the use of a watchman as allowed by § 3715.2-2, and you have begun consultation with BLM under § 3715.3. If BLM decides not to concur in the occupancy, the temporary occupancy must stop.
Cross-references to the CFR
3715.13715.2-23715.3.