43 C.F.R. § 3802.4-7

Notice of suspension of operations.

Last amended: 2016Year: 2026Length: 97 wordsSubsections: 3Official source

Cite as 43 C.F.R. § 3802.4-7 (2026)

(a) Except for seasonal suspension, the operator shall notify the authorized officer of any suspension of operations within 30 days after such suspension. This notice shall include: (1) Verification of intent to maintain structures, equipment, and other facilities, and (2) The expected reopening date. (b) The operator shall maintain the operating site, structure, and other facilities in a safe and environmentally acceptable condition during nonoperating periods. (c) The name and address of the operator shall be clearly posted and maintained in a prominent place at the entrance to the area of mining operations during periods of nonoperation.
43 C.F.R. § 3802.4-7: Notice of suspension of operations. | Justis AI