43 C.F.R. § 3809.334

What if I temporarily stop conducting operations under a notice?

Last amended: 2016Year: 2026Length: 107 wordsSubsections: 2Official source

Cite as 43 C.F.R. § 3809.334 (2026)

(a) If you stop conducting operations for any period of time, you must— (1) Maintain public lands within the project area, including structures, in a safe and clean condition; (2) Take all steps necessary to prevent unnecessary or undue degradation; and (3) Maintain an adequate financial guarantee. (b) If the period of non-operation is likely to cause unnecessary or undue degradation, BLM, in writing, will— (1) Require you to take all steps necessary to prevent unnecessary or undue degradation; and (2) Require you, after an extended period of non-operation for other than seasonal operations, to remove all structures, equipment, and other facilities and reclaim the project area.
43 C.F.R. § 3809.334: What if I temporarily stop conducting operations under a notice? | Justis AI