46 C.F.R. § 112.15-10
Loads on systems without a temporary emergency power source.
Cite as 46 C.F.R. § 112.15-10 (2026)
If there is no temporary emergency power source, the loads under § 112.15-1 must be arranged so that they can be energized from the final emergency power source.
- Cross-references to the CFR
- 112.15-1