46 C.F.R. § 112.25-10

Transfer of emergency loads.

Last amended: 2016Year: 2026Length: 88 wordsSubsections: 2Official source

Cite as 46 C.F.R. § 112.25-10 (2026)

(a) When the potential of the final emergency source reaches 85 to 95 percent of normal value, the emergency loads under § 112.15-5 must transfer automatically to the final emergency power source and this transfer must be accomplished in no more than 45 seconds after failure of the normal source of power. (b) When the potential from the normal source has been restored, the emergency loads must be manually or automatically transferred to the normal source, and the final emergency power source must be manually or automatically stopped.