46 C.F.R. § 153.1500

Venting system rupture disks.

Last amended: 2016Year: 2026Length: 36 wordsOfficial source

Cite as 46 C.F.R. § 153.1500 (2026)

The master shall ensure that a relief valve exposed to a cargo after the failure of a rupture disk or breaking pin is cleaned and operates properly before the next cargo is loaded into the tank.
46 C.F.R. § 153.1500: Venting system rupture disks. | Justis AI