46 C.F.R. § 154.355

Bow and stern loading piping.

Last amended: 2016Year: 2026Length: 139 wordsSubsections: 2Official source

Cite as 46 C.F.R. § 154.355 (2026)

(a) Bow and stern loading piping must: (1) Meet § 154.310; (2) Be installed in an area away from the accommodation, service, or control space on type IG hulls; (3) Be clearly marked; (4) Be segregated from the cargo piping by a removable spool piece in the cargo area or by at least two shut-off valves in the cargo area that have means of locking to meet § 154.1870(a); (5) Have a means for checking for cargo vapor between the two valves under paragraph (a)(4) of this section; (6) Have fixed inert gas purging lines; and (7) Have fixed vent lines for purging with inert gas to meet § 154.1870(b). (b) Entrances, forced or natural ventilation intakes, exhausts, and other openings to accommodation, service, or control spaces that face the bow or stern loading area must meet § 154.330.
Cross-references to the CFR
154.1870154.310154.330.
46 C.F.R. § 154.355: Bow and stern loading piping. | Justis AI