46 C.F.R. § 160.115-23

Procedure for approval of design or material change.

Last amended: 2016Year: 2026Length: 134 wordsSubsections: 3Official source

Cite as 46 C.F.R. § 160.115-23 (2026)

(a) Each change in design, material, or construction from the plans approved under 46 CFR 159.005-13 and § 160.115-13(h) of this subpart must be approved by the Commandant before being used in any production winch. The manufacturer must submit any such change following the procedures in § 160.115-9 of this subpart, but documentation on items that are unchanged from the plans approved under 46 CFR 159.005-13 and § 160.115-13(h) of this subpart need not be resubmitted. (b) Unless determined by the Commandant to be unnecessary, a prototype winch with each change described in paragraph (a) of this section must be made and tested according to the procedures for new approvals in §§ 160.115-9 through 160.115-13 of this subpart. (c) Determinations of equivalence of design, construction, and materials will be made by the Commandant only.
Cross-references to the CFR
160.115-13160.115-946:159.005-13
46 C.F.R. § 160.115-23: Procedure for approval of design or material change. | Justis AI