46 C.F.R. § 160.264-23

Procedure for approval of design or material change.

Last amended: 2025Year: 2026Length: 44 wordsSubsections: 2Official source

Cite as 46 C.F.R. § 160.264-23 (2026)

(a) The manufacturer must submit any proposed changes in design, material, or construction to the recognized laboratory for approval before changing PFD production methods. (b) Determinations of equivalence of design, construction, and materials must be made only by the Commandant or a designated representative.
46 C.F.R. § 160.264-23: Procedure for approval of design or material change. | Justis AI