46 C.F.R. § 170.095

Data submittal for a vessel equipped to lift.

Last amended: 2016Year: 2026Length: 83 wordsSubsections: 3Official source

Cite as 46 C.F.R. § 170.095 (2026)

The following data must be submitted with the plans required by § 170.075 if the vessel is engaged in lifting and is required to comply with subpart B of part 173 of this chapter: (a) A graph of maximum hook load versus maximum crane radius. (b) A table of crane radius versus the maximum distance above the main deck to which the hook load can be raised. (c) A table showing maximum vertical and transverse moments at which the crane is to operate.