46 C.F.R. § 173.007

Location of the hook load.

Last amended: 2016Year: 2026Length: 23 wordsOfficial source

Cite as 46 C.F.R. § 173.007 (2026)

When doing the calculations required in this subpart, the hook load must be considered to be located at the head of the crane.
46 C.F.R. § 173.007: Location of the hook load. | Justis AI