46 C.F.R. § 182.330

Pressure vessels.

Last amended: 2016Year: 2026Length: 38 wordsOfficial source

Cite as 46 C.F.R. § 182.330 (2026)

All unfired pressure vessels must be installed to the satisfaction of the cognizant OCMI. The design, construction, and original testing of such unfired pressure vessels must meet the applicable requirements of subchapter F (Marine Engineering) of this chapter.
46 C.F.R. § 182.330: Pressure vessels. | Justis AI