46 C.F.R. § 30.10-37

Keel laying date—TB/ALL.

Last amended: 2016Year: 2026Length: 44 wordsOfficial source

Cite as 46 C.F.R. § 30.10-37 (2026)

The term keel laying date means the date upon which progressive construction identifiable with a specific vessel begins, including construction of the first module or prefabricated section of the hull that is identifiable with that vessel. [CGD 74-127, 41 FR 3843, Jan. 26, 1976]