46 C.F.R. § 3.10-5
Renewal of letter of designation.
Cite as 46 C.F.R. § 3.10-5 (2026)
At least 60 days prior to the expiration date of the letter of designation or certificate of inspection, a request for renewal must be submitted in the same manner as described in 3.10-1. However, if the request for renewal is submitted to the Officer in Charge, Marine Inspection, who made the initial determination and all operating conditions remain unchanged, the information required by § 3.10-1(b) need not be resubmitted with the request.
- Cross-references to the CFR
- 3.10-1