46 C.F.R. § 45.35

Seasonal load lines.

Last amended: 2016Year: 2026Length: 31 wordsOfficial source

Cite as 46 C.F.R. § 45.35 (2026)

Each vessel must have the summer (S), midsummer (MS), intermediate (I), and winter (W) loadlines for fresh water freeboards calculated under §§ 45.71 through 45.75 marked in accordance with § 45.39.
Cross-references to the CFR
45.39.45.71
46 C.F.R. § 45.35: Seasonal load lines. | Justis AI