46 C.F.R. § 63.25-7
Exhaust gas boilers.
Cite as 46 C.F.R. § 63.25-7 (2026)
(a)
Construction.
An auxiliary exhaust gas boiler must meet the applicable construction requirements of part 52 or part 53 of this subchapter as determined from table 1 to § 54.01-5 of this subchapter.
(b)
Controls.
Each drum type exhaust gas steam boiler must have a feed water control system. The system must automatically supply the required amount of feed water and maintain it at the proper level. For boilers without a fixed water level, the control system must supply the feed water at a rate sufficient to ensure proper heat transfer. The system must adequately fill the boiler when cold.
(c)
Alarms.
When a condition arises which results in inadequate heat transfer, a high temperature alarm or low flow alarm must be activated. An audible alarm must automatically sound, and a visual indicator must indicate when the fluid temperature exceeds the maximum operating temperature or when the fluid/steam flowing through the heat exchanger is insufficient to ensure proper heat transfer. Additionally, an audible alarm must automatically sound, and a visual indicator must indicate when a soot fire is present in the exhaust gas boiler's uptake.
[CGD 88-057, 55 FR 24237, June 15, 1990, as amended by USCG-2020-0634, 89 FR 50198, June 12, 2024]
- Cross-references to the CFR
- 54.01-5