46 C.F.R. § 64.77

Inspection and test.

Last amended: 2016Year: 2026Length: 141 wordsSubsections: 4Official source

Cite as 46 C.F.R. § 64.77 (2026)

For the handling and stowage requirements in § 98.30-3 of this chapter, each MPT must pass the following inspections and tests conducted by the owner or the owner's representative: (a) Pressure relief and vacuum relief devices must be inspected one time or more during each 12 month period of service in accordance with § 64.79. (b) An MPT must be inspected during the 30 months before any month in which it is in service in accordance with § 64.81. (c) An MPT must pass a hydrostatic test in accordance with § 64.83 during the 60 months before any month in which it is in service. (d) After each welded repair, an MPT must pass a hydrostatic test in accordance with § 64.83. [CGD 73-172, 39 FR 22950, June 25, 1974, as amended by CGD 84-043, 55 FR 37410, Sept. 11, 1990]
Cross-references to the CFR
64.79.64.81.64.8364.83.98.30-3
46 C.F.R. § 64.77: Inspection and test. | Justis AI