47 C.F.R. § 76.1803

Signal leakage monitoring.

Last amended: 2016Year: 2026Length: 73 wordsOfficial source

Cite as 47 C.F.R. § 76.1803 (2026)

MVPDs subject to § 76.611 must submit the results of ground based measurements derived in accordance with § 76.611(a)(1) or airspace measurements derived in accordance with § 76.611(a)(2), including a description of the method by which compliance with basic signal leakage criteria is achieved and the method of calibrating the measurement equipment. This information shall be provided to the Commission each calendar year via FCC Form 320. [68 FR 27003, May 19, 2003]
Cross-references to the CFR
76.611