47 C.F.R. § 90.551
Construction requirements.
Cite as 47 C.F.R. § 90.551 (2026)
Each station authorized under this subpart to operate in the 769-775 MHz and 799-805 MHz frequency bands must be constructed and placed into operation within 12 months from the date of grant of the authorization, except for State channels. However, licensees may request a longer construction period, up to but not exceeding 5 years, pursuant to § 90.155(b). State channels are subject to the build-out requirements in § 90.529. [72 FR 48863, Aug. 24, 2007]