48 C.F.R. § 1325.204

Evaluating offers of foreign construction material.

Last amended: 2016Year: 2026Length: 43 wordsOfficial source

Cite as 48 C.F.R. § 1325.204 (2026)

The designee authorized to specify a percentage higher than the 6 percent that the contracting officer must add to the cost of any foreign construction material proposed for exception from the requirements of the Buy America Act is set forth in CAM 1301.70.
48 C.F.R. § 1325.204: Evaluating offers of foreign construction material. | Justis AI