48 C.F.R. § 1334.005-6
Full production.
Cite as 48 C.F.R. § 1334.005-6 (2026)
The designee authorized to reaffirm mission need and program objectives and grant approval to proceed with the award of a contract for full production of a successfully tested major system is set forth in CAM 1301.70.