48 C.F.R. § 242.7401
Procedures.
Cite as 48 C.F.R. § 242.7401 (2026)
When the program, project, or system manager determines that a technical representative is required, follow the procedures at PGI 242.7401. [70 FR 67921, Nov. 9, 2005]
48 C.F.R. § 242.7401
Cite as 48 C.F.R. § 242.7401 (2026)