48 C.F.R. § 244.302
Requirements.
Cite as 48 C.F.R. § 244.302 (2026)
(a) In lieu of the threshold at FAR 44.302(a), the ACO shall determine the need for a CPSR if a contractor's sales to the Government are expected to exceed $50 million during the next 12 months. [84 FR 72249, Dec. 31, 2019]