48 C.F.R. § 3006.303-270
Content.
Cite as 48 C.F.R. § 3006.303-270 (2026)
(a)(9)(iv) For a proposed contract subject to the restrictions of (HSAR) 48 CFR 3006.302-270(d)(1)(iii) and where (FAR) 48 CFR 6.302-2 is cited as the authority, the exceptional circumstances allowing for an award for a period of performance in excess of 150 days.
[77 FR 50634, Aug. 22, 2012]
- Cross-references to the CFR
- 48:3006.302-27048:6.302-2