48 C.F.R. § 30.202-8

Subcontractor disclosure statements.

Last amended: 2020Year: 2026Length: 98 wordsSubsections: 1Official source

Cite as 48 C.F.R. § 30.202-8 (2026)

(a) When the Government requires determinations of adequacy of subcontractor disclosure statements, the CFAO for the subcontractor shall provide this determination to the CFAO for the contractor or next higher-tier subcontractor. The higher-tier CFAO shall not change the determination of the lower-tier CFAO. (b) Any determination that it is impractical to secure a subcontractor's Disclosure Statement must be made in accordance with 48 CFR 9903.202-2. [57 FR 39587, Aug. 31, 1992, as amended at 61 FR 18918, Apr. 29, 1996; 62 FR 40237, July 25, 1997; 70 FR 11753, Mar. 9, 2005; 85 FR 67615, Oct. 23, 2020]
Cross-references to the CFR
48:9903.202-2.