48 C.F.R. § 53.209-1

Responsible prospective contractors.

Last amended: 2018Year: 2026Length: 109 wordsOfficial source

Cite as 48 C.F.R. § 53.209-1 (2026)

The following forms are prescribed for use in conducting preaward surveys of prospective contractors, as specified in 9.106-1, 9.106-2, and 9.106-4. These forms are authorized for local reproduction and can be found at the GSA Forms Library at https://www.gsa.gov/forms. (a) SF 1403 (Rev. 01/2014), Preaward Survey of Prospective Contractor (General). (b) SF 1404 (Rev. 01/2014), Preaward Survey of Prospective Contractor—Technical. (c) SF 1405 (Rev. 01/2014), Preaward Survey of Prospective Contractor—Production. (d) SF 1406 (Rev. 01/2014), Preaward Survey of Prospective Contractor—Quality Assurance. (e) SF 1407 (Rev. 01/2014), Preaward Survey of Prospective Contractor—Financial Capability. (f) SF 1408 (Rev. 01/2014), Preaward Survey of Prospective Contractor—Accounting System. [83 FR 42576, Aug. 22, 2018]