48 C.F.R. § 836.521

Specifications and drawings for construction .

Last amended: 2019Year: 2026Length: 38 wordsOfficial source

Cite as 48 C.F.R. § 836.521 (2026)

The contracting officer shall insert the clause at 852.236-71, Specifications and Drawings for Construction, in solicitations and contracts for construction that include the FAR clause at 52.236-21, Specifications and Drawings for Construction. [84 FR 9972, Mar. 19, 2019]
48 C.F.R. § 836.521: Specifications and drawings for construction . | Justis AI