48 C.F.R. § 925.202
Exceptions.
Cite as 48 C.F.R. § 925.202 (2026)
(a)(2) Contracting officers may make the determination required by 48 CFR 25.202(a)(2), if the cost of the materials is not expected to exceed $100,000.
[75 FR 69013, Nov. 10, 2010]
- Cross-references to the CFR
- 48:25.202