48 C.F.R. § 970.1708-2

General.

Last amended: 2024Year: 2026Length: 86 wordsOfficial source

Cite as 48 C.F.R. § 970.1708-2 (2026)

M&O contractors may elect to enter into agreements directly with non-Federal sponsors to conduct research at the facility the M&O contractor is responsible for managing and operating so long as the work does not present, or minimizes, any apparent COI, as well as avoiding or neutralizing any actual COI as a result of the agreement. This research is conducted at the M&O contractor's risk and the M&O contractor may obtain compensation beyond full-cost recovery for accepting the risk of performance. [89 FR 89783, Nov, 13, 2024]
48 C.F.R. § 970.1708-2: General. | Justis AI