49 C.F.R. § 179.500-3
Type and general requirements.
Cite as 49 C.F.R. § 179.500-3 (2026)
(a) Tanks built under this specification shall be hollow forged or drawn in one piece. Forged tanks shall be machined inside and outside before ends are necked-down and, after necking-down, the ends shall be machined to size on the ends and outside diameter. Machining not necessary on inside or outside of seamless steel tubing, but required on ends after necking-down. (b) For tanks made in foreign countries, chemical analysis of material and all tests as specified must be carried out within the limits of the United States under supervision of a competent and disinterested inspector; in addition to which, provisions in § 179.500-18 (b) and (c) shall be carried out at the point of manufacture by a recognized inspection bureau with principal office in the United States. (c) The term “marked end” and “marked test pressure” used throughout this specification are defined as follows: (1) “Marked end” is that end of the tank on which marks prescribed in § 179.500-17 are stamped. (2) “Marked test pressure” is that pressure in psig which is indicated by the figures substituted for the **** in the marking DOT-107A **** stamped on the marked end of tank. (d) The gas pressure at 130 °F in the tank shall not exceed 7/10 of the marked test pressure of the tank. [Amdt. 179-32, 48 FR 27708, June 16, 1983, as amended at 66 FR 45186, 45391, Aug. 28, 2001]
- Cross-references to the CFR
- 179.500-17179.500-18