49 C.F.R. § 192.715

Transmission lines: Permanent field repair of welds.

Last amended: 2016Year: 2026Length: 170 wordsSubsections: 3Official source

Cite as 49 C.F.R. § 192.715 (2026)

Each weld that is unacceptable under § 192.241(c) must be repaired as follows: (a) If it is feasible to take the segment of transmission line out of service, the weld must be repaired in accordance with the applicable requirements of § 192.245. (b) A weld may be repaired in accordance with § 192.245 while the segment of transmission line is in service if: (1) The weld is not leaking; (2) The pressure in the segment is reduced so that it does not produce a stress that is more than 20 percent of the SMYS of the pipe; and (3) Grinding of the defective area can be limited so that at least 1/8 -inch (3.2 millimeters) thickness in the pipe weld remains. (c) A defective weld which cannot be repaired in accordance with paragraph (a) or (b) of this section must be repaired by installing a full encirclement welded split sleeve of appropriate design. [35 FR 13257, Aug. 19, 1970, as amended by Amdt. 192-85, 63 FR 37504, July 13, 1998]
Cross-references to the CFR
192.241192.245192.245.