49 C.F.R. § 195.128

Station piping.

Last amended: 2016Year: 2026Length: 22 wordsOfficial source

Cite as 49 C.F.R. § 195.128 (2026)

Any pipe to be installed in a station that is subject to system pressure must meet the applicable requirements of this subpart.
49 C.F.R. § 195.128: Station piping. | Justis AI